Another 100 meters covered walkway will be constructed from MRT stop just before the overhead bridge.
Hopefully, the covered walkway will be constructed to the LRT Salak South station before end 2025.
DBKL has installed webcam cameras at Jalan Razak Mansion and Jalan Razak Mansion 1. The cameras will be monitored by DBKL Command And Con...
No comments:
Post a Comment